Manufacturer of Elastomeric Waterproof Ms Coating Products
Description
Basic Info.
Model NO. | SV910 |
Bonding Material | Building |
Transport Package | Carton |
Specification | 20kg/drum |
Trademark | SIWAY |
Origin | China |
HS Code | 3507909000 |
Production Capacity | 50000kg/Month |
Product Description
·Siway·SV910 MS WATERPROOFING COATING
Product Description Paint Concrete Floor Mositure Curing Waterproofing Materials Odorless, Eco-friendly, No Harm to the Builder Excellent Waterproof, Best Sealing, Bright Color Resistant to Oil, Acid, Alkali ,Puncture, Chemical Corrosion Single Component, Easy to Use, Convenient Operation 300%+ Elongation, Super-bonding without Crack Resistance to Tear, Shifting, Settlement Joint |
Applications :
1. Waterproofing and moisture proofing for kitchen, bathroom, balcony, roof and so on.
2. Anti-seepage of reservoir, water tower, water tank, swimming pool, bath, fountain pool, sewage treatment pool and drainage irrigation channel.
3. Leak-proofing and anti-corrosion for ventilated basement, underground tunnel, deep well and underground pipe and so on.
4. Bonding and moisture proofing of all kinds of tiles, marble, wood, asbestos and so on.
·Technical Data Table
PROPERTY | UV-RESISTANT |
Color | Grey, White (Customized ) |
Density (g/cm³) | 1.30±0.1 |
Surface Dry Time (min) | 30 |
Tensile Strength (Mpa) | >1 |
Curing Speed (mm/24h) | 3 ~ 5 |
Elongation at Break (%) | ≥300 |
Solid Content (%) | 60 |
Operation Temperature ( ºC) | 5-35 ºC |
Service Temperature ( ºC) | -40~+80ºC |
Shelf Life (Month) | 12 |
Related products·Operation
First Step
Brushing the part like corner, tubes root, then symmetrical scraping. The thickness of the coating is generally 0.5mm. (Avoid bubble). When operation,It should be considered about the size, shape and environment of the construction area.
Second Step
Symmetrical scraping when the coating is completely solidified (about 12 hours later). The thickness of the coating should be 0.7mm, and the direction of smearing should be perpendicular to the first time. The specific operation is the same as the first step.
Third Step
Symmetrical scraping when the coating is completely solidified (about 12 hours later). The direction of smearing should be perpendicular to the second time. The specific operation is the same as the first step.The operation times depends on the design thickness, the overall thickness is 2.0-2.2mm.
·Packing and Storage
1KG/Drum, 5Kg/Drum,20KG/Drum, 25Kg/Drum.
·Safety Operation Data
MSDS isn't included here. Please read TDS, MSDS and label carefully before operation. You can get MSDS from SIWAY or other distributors, or mail to service center call
·Our Factory
Waiting for your inquirywelcome to visit us
Our Contact